|
|
Details for Request 2(09)-5
Request Type: |
Interpretation |
Requesting Agency: |
Utah DOT |
State: |
UT |
Date of Request: |
7/6/2010 |
Topic: |
Overhead Arrow-per-Lane Sign Requirements for Major Interchanges and Reconstructed Locations |
Affected Portions of 2009 MUTCD: |
Section 2E.20| Section 2E.21 |
FHWA Ruling: |
Engineering judgment is to be used to determine whether a particular non-system interchange multi-lane exit with an option lane should be classified as a category (b) major interchange or as an intermediate interchange for the purposes of guide signing de |
Keywords: |
Signs| Signs - Guide |
Contact Information:
|