|
|
Details for Request 2(09)-62
Request Type: |
Interpretation |
Requesting Agency: |
California DOT |
State: |
CA |
Date of Request: |
10/29/2012 |
Topic: |
Use of Signal Ahead Signs for Ramp Metering |
Affected Portions of 2009 MUTCD: |
Section 2C.37 |
FHWA Ruling: |
The use of a Signal Ahead (W3-3) sign in advance of a ramp control signal is not in substantial conformance with the MUTCD. The W3-7 and W3-8 signs are the appropriate signs to be used with ramp control signals. |
Keywords: |
Signals - Lane-Use; Ramp Control; Movable Bridge| Signs| Signs - Warning; Object Markers |
Contact Information:
|