Request Type: |
Interpretation |
Requesting Agency: |
Oregon DOT |
State: |
OR |
Date of Request: |
5/20/1996 |
Topic: |
Conditions Justifying Shortening or Omission of Pedestrian Clearance Time in Railroad Preemption |
Affected Portions of 2009 MUTCD: |
Section 4D.27| Section 4E.06 |
FHWA Ruling: |
6/26/1996 – There are no specific conditions. Engineering judgment should be used and documented. |
Keywords: |
Pedestrian Signals| Railroad Grade Crossings| Traffic Control Signals |