Request Type: |
Interpretation |
Requesting Agency: |
Parsons Brinckerhoff |
State: |
NJ |
Date of Request: |
5/2/2001 |
Topic: |
All Red Priority Hold in Light Rail Transit Preemption |
Affected Portions of 2009 MUTCD: |
Section 4D.26| Section 4D.27| Section 8C.10 |
FHWA Ruling: |
6/1/2001 – All-red priority hold to facilitate passage of light rail transit vehicle through intersection does not constitute a variable red clearance interval duration and is allowed by MUTCD. |
Keywords: |
Light Rail Transit Traffic Control Devices| Traffic Control Signals |