|
|
Details for Request 4-65
Request Type: |
Interpretation |
Requesting Agency: |
Citizen |
State: |
XX |
Date of Request: |
4/12/1985 |
Topic: |
Determining Number of Approach Lanes for Signal Warrants Evaluation |
Affected Portions of 2009 MUTCD: |
Section 4C.01 |
FHWA Ruling: |
10/28/1985 – Engineering judgment must be used. Where approach has one through/right lane plus one left turn lane, if the left turn volume is minor, it should be considered a one-lane approach. If the volume split of the left and through/right lanes appr |
Keywords: |
Traffic Control Signals| Warrants |
Contact Information:
|