|
|
Details for Request 4-66
Request Type: |
Change |
Requesting Agency: |
NCUTCD |
State: |
XX |
Date of Request: |
6/24/1984 |
Topic: |
Satisfaction of Signal Warrant Is Not a Mandate for a Signal Installation |
Affected Portions of 2009 MUTCD: |
Chapter 4C |
FHWA Ruling: |
3/9/1987 – Adopted in Final Rule for Revision #5 of 1978 MUTCD modifying language to make it clear that a study is required, considering factors beyond those in the warrants. |
Keywords: |
Traffic Control Signals| Warrants |
Contact Information:
|