empty cell
Manual on Uniform Traffic Control Devices (MUTCD) arrows logo
Resources

Details for Request 4(09)-38


Request Type: Interpretation
Requesting Agency: Carmanah Technologies Corporation (Canada)
State: XX
Date of Request: 9/25/2013
Topic: Rectangular Rapid Flashing Beacon Flashing Extensions and Delays
Affected Portions of 2009 MUTCD: Interim Approval 11
FHWA Ruling: The predetermined flash period should be initiated each and every time that a pedestrian is detected either through passive detection or as a result of a pedestrian pressing a pushbutton detector.
Keywords: Beacons| Pedestrians

Contact Information:

Name: