|
|
Details for Request 4(09)-38
Request Type: |
Interpretation |
Requesting Agency: |
Carmanah Technologies Corporation (Canada) |
State: |
XX |
Date of Request: |
9/25/2013 |
Topic: |
Rectangular Rapid Flashing Beacon Flashing Extensions and Delays |
Affected Portions of 2009 MUTCD: |
Interim Approval 11 |
FHWA Ruling: |
The predetermined flash period should be initiated each and every time that a pedestrian is detected either through passive detection or as a result of a pedestrian pressing a pushbutton detector. |
Keywords: |
Beacons| Pedestrians |
Contact Information:
|