empty cell
Manual on Uniform Traffic Control Devices (MUTCD) arrows logo
Resources

Details for Request 4(09)-59


Request Type: Interpretation
Requesting Agency: McTrans at the University of Florida
State: FL
Date of Request: 7/27/2016
Topic: Clarification of Higher-Volume Minor-Street Approach
Affected Portions of 2009 MUTCD: Chapter 4C
FHWA Ruling: The minor-street approach that has a volume that meets the warranting criterion should be selected for each hour that is being analyzed. The warranting minor-street approach will not necessarily be the one that has the higher volume.
Keywords: Traffic Control Signals| Warrants

Contact Information:

Name: