empty cell
Manual on Uniform Traffic Control Devices (MUTCD) arrows logo
Knowledge bar

New Standard Signs included in the 11th Edition of the MUTCD—Phased Releases of PDF, EPS, and SVG files

The new 2024 Edition of the Standard Highway Signs (SHS) publication is currently in progress and will be released in Phases. Layouts for new signs in the 11th Edition of the MUTCD will be released here first, with periodic updates as additional sign details are finalized culminating in the publication of the 2024 Edition of SHS. While the Federal Highway Administration completes the publication of the design details for the signs added in the 11th Edition of the MUTCD, the phased releases of new sign designs should be used along with the old designs contained in the 2004 Edition of SHS and the 2012 Supplement, until such time that the full publication is released. Once the 2024 Edition of SHS is released, the 2004 Edition of SHS and the 2012 Supplement will become obsolete.

Links will be posted for each release of standard highway sign design details:

  1. Individual pages, within a single combined PDF document, of the forthcoming SHS publication with detailed dimensions and sign or plaque legend and background color information. Please note, all dimensions shown are in inches.
  2. Individual corresponding pages of the forthcoming SHS publication’s Appendices, as separate combined PDF documents, which include detailed text descriptions of the detailed sign dimensions. If multiple sign types (e.g., regulatory and school) are included in the same release, the corresponding appendix files will be posted as separate files.
  3. Full-size, vector-based, undimensioned sign layouts in PDF, EPS, and SVG formats. Layouts are to actual scale for each standard sign size indicated and can be transmitted directly to an electronic vinyl cutter for fabrication purposes and mounting onto a sign substrate. Please note that sign layouts do not necessarily scale directly from one size to the next, so be certain to use the correct file for the specified sign size.

The EPS, PDF, and SVG files for each sign included in a release are contained in a sub-folder specific to each sign designation within a single ZIP file for the release. All of the available sizes specified in the 11th Edition of the MUTCD for a particular standard sign will be included.

Additional files for signs not included in the current releases are still being developed.

Development Status of Standard Sign Designs and Fabrication Details – 11th Edition of the MUTCD

The following status tables include the sign designations, signs, notes, and release status for the standard signs included in the 11th Edition of the MUTCD. Within the notes column, short descriptions (e.g., New Sign, New Size Added, Revised Size, Redesignated and Revised, Redesignated, and Revised) indicate those signs which are newly adopted, include new or revised sizes, are redesignated with additional revisions or are simply redesignated, or are revised in the 11th Edition of the MUTCD and 2024 SHS. For reference purposes see the 2004 SHS or the 2012 Supplement for sign details not yet available in the 2024 SHS releases. Once the 2024 SHS details have been issued for a particular sign the details included in the 2004 SHS and 2012 Supplement are superseded and considered obsolete. For State adoption purposes the 2024 SHS details will need to be reflected.

Regulatory Signs

Sign Designation
Sign
Notes
Date Posted
R1-1 Stop Under Development
R1-2 Yield Under Development
R1-2aP To Oncoming Traffic (plaque) Under Development
R1-2bP To Traffic in Circle (plaque) New Sign 9/27/2024
R1-2cP To All Lanes (plaque) New Sign 9/27/2024
R1-3P All-Way (plaque) Under Development
R1-5 Yield Here to Pedestrians Under Development
R1-5b Stop Here for Pedestrians Under Development
R1-5d Yield Here to Trail Crossing New Sign 9/27/2024
R1-5e Stop Here for Trail Crossing New Sign 9/27/2024
R1-6 In-Street Pedestrian Crossing - Yield Under Development
R1-6a In-Street Pedestrian Crossing - Stop Under Development
R1-6d In-Street Trail Crossing - Yield New Sign 9/27/2024
R1-6e In-Street Trail Crossing - Stop New Sign 9/27/2024
R1-9 Overhead Pedestrian Crossing - Yield Revised Under Development
R1-9a Overhead Pedestrian Crossing - Stop Revised Under Development
R1-9d Overhead Trail Crossing - Yield New Sign 9/27/2024
R1-9e Overhead Trail Crossing - Stop New Sign 9/27/2024
R1-10P Except Right Turn (plaque) Under Development
R2-1 Speed Limit Under Development
R2-2P Truck Speed Limit (plaque) Under Development
R2-2aP Bus Speed Limit (plaque) New Sign 9/27/2024
R2-2bP Truck-Bus Speed Limit (plaque) New Sign 9/27/2024
R2-2cP Vehicles Over X Tons Speed Limit (plaque) New Sign 9/27/2024
R2-3P Night Speed Limit (plaque) Under Development
R2-4P Minimum Speed Limit (plaque) Revised Size Under Development
R2-4a Combined Maximum and Minimum Speed Limits Under Development
R2-5P Unless Otherwise Posted (plaque) Under Development
R2-5aP Citywide (plaque) Under Development
R2-5bP Neighborhood (plaque) Under Development
R2-5cP Residential (plaque) Under Development
R2-6P Fines Higher (plaque) Under Development
R2-6aP Fines Double (plaque) Under Development
R2-6bP $XX Fine (plaque) Under Development
R2-10 Begin Higher Fines Zone Under Development
R2-11 End Higher Fines Zone Under Development
R2-13 End Variable Speed Limit New Sign 9/27/2024
R2-14 End Truck Speed Limit New Sign 9/27/2024
R3-1 Movement Prohibition - No Right Turn Under Development
R3-1a No Right Turn Across Tracks (activated blank-out) Revised Under Development
R3-1b Movement Prohibition, Vehicle Class (1 line) New Sign 9/27/2024
R3-1c Movement Prohibition, Vehicle Class (2 lines) New Sign 9/27/2024
R3-1d Movement Prohibition, Vehicle Class (3 lines) New Sign 9/27/2024
R3-1e Movement Prohibition, Vehicle Exception (1 line) New Sign 9/27/2024
R3-1f Movement Prohibition, Vehicle Exception (2 lines) New Sign 9/27/2024
R3-1g Movement Prohibition, Part-Time (2 lines) New Sign 9/27/2024
R3-1h Movement Prohibition, Part-Time (3 lines) New Sign 9/27/2024
R3-2 Movement Prohibition - No Left Turn Under Development
R3-2a No Left Turn Across Tracks (activated blank-out) Revised Under Development
R3-3 Movement Prohibition - No Turns Under Development
R3-4 Movement Prohibition - No U Turn Under Development
R3-5 Mandatory Movement Lane Control - Turn Only Under Development
R3-5a Mandatory Movement Lane Control - Through Only Under Development
R3-5bP Left Lane (plaque) Under Development
R3-5cP HOV 2+ (plaque) Under Development
R3-5dP Taxi Lane (plaque) Under Development
R3-5fP Right Lane (plaque) Under Development
R3-5gP Bus Lane (plaque) Under Development
R3-5hP Bike Lane (plaque) New Sign 9/27/2024
R3-6 Optional Movement Lane Control - Thru and Turn Under Development
R3-6a Optional Movement Lane Control - U and Left Turns New Sign 9/27/2024
R3-6b Optional Movement Lane Control - Oblique New Sign 9/27/2024
R3-7 Right (Left) Lane Must Turn Right (Left) New Size 9/27/2024
R3-7aP Except Buses (plaque) New Sign 9/27/2024
R3-7bP Except Bicycles (plaque) New Sign 9/27/2024
R3-8 Advance Intersection Lane Control (2 lanes) Under Development
R3-8a Advance Intersection Lane Control (3 lanes) Under Development
R3-8b Advance Intersection Lane Control (3 lanes) Under Development
R3-8x Advance Intersection Lane Control with Bike Lane New Sign 9/27/2024
R3-8zd Advance Circular Intersection Lane Control (2 lanes) New Sign 9/27/2024
R3-8ze Advance Circular Intersection Lane Control (2 lanes) New Sign 9/27/2024
R3-8zf Advance Circular Intersection Lane Control (2 lanes) New Sign 9/27/2024
R3-8zg Advance Circular Intersection Lane Control (2 lanes) New Sign 9/27/2024
R3-9a Two-Way Left Turn Only (overhead) Under Development
R3-9b Two-Way Left Turn Only (post-mounted) Under Development
R3-9cP BEGIN (plaque) New Size Added, Revised Size 9/27/2024
R3-9dP END (plaque) New Size Added, Revised Size 9/27/2024
R3-9e Reversible Lane Control (overhead) Under Development
R3-9f Reversible Lane Control (post-mounted) Under Development
R3-9g Advance Reversible Lane Control Transition Under Development
R3-9h Advance Reversible Lane Control Transition Under Development
R3-9i End Reverse Lane Under Development
R3-10 Preferential Lane Vehicle Occupancy Definition (post-mounted) Under Development
R3-10a Preferential Lane Vehicle Occupancy Definition (post-mounted) Under Development
R3-11 Preferential Lane Operation - High-Occupancy Vehicles (post-mounted) Under Development
R3-11a Preferential Lane Operation - High-Occupancy Vehicles (post-mounted) Revised Under Development
R3-11b Preferential Lane Operation - High-Occupancy Vehicles, Full-Time (post-mounted) Redesignated and Revised Under Development
R3-11c Preferential Lane Operation - High-Occupancy Vehicles, Full-Time (post-mounted) New Sign 9/27/2024
R3-11d Preferential Lane Operation (post-mounted) Redesignated Under Development
R3-11e Preferential Lane Operation - Full-Time (post-mounted) New Sign 9/27/2024
R3-11f Preferential Lane Operation (post-mounted) New Sign 9/27/2024
R3-11g Preferential Lane Operation - Full-Time (post-mounted) New Sign 9/27/2024
R3-11hP Motorcycles Allowed (plaque) Redesignated 9/27/2024
R3-12 Preferential Lane Ahead - High-Occupancy Vehicles (post-mounted) Under Development
R3-12a Preferential Lane Ends - High-Occupancy Vehicles (post-mounted) Under Development
R3-12b Preferential Lane Ends - High-Occupancy Vehicles (post-mounted) Under Development
R3-12c Preferential Lane Restriction Ends - High-Occupancy Vehicles (post-mounted) Under Development
R3-12d Preferential Lane Restriction Ends - High-Occupancy Vehicles (post-mounted) Under Development
R3-12e Preferential Lane Ahead - High-Occupancy Vehicles (post-mounted) Under Development
R3-12f Preferential Lane Ahead (post-mounted) Under Development
R3-12g Preferential Lane Ends (post-mounted) Under Development
R3-12h Preferential Lane Ends (post-mounted) Under Development
R3-13 Preferential Lane Vehicle Occupancy Definition (overhead) Under Development
R3-13a Preferential Lane Vehicle Occupancy Definition (overhead) Under Development
R3-14 HOV Lane Operation (overhead) Under Development
R3-14a HOV Lane Operation (overhead) Under Development
R3-14b HOV Lane Operation (overhead) Under Development
R3-14c Preferential Lane Operation (overhead) Under Development
R3-15 HOV Lane Ahead (overhead) Under Development
R3-15a HOV Lane Begins XX Miles (overhead) Under Development
R3-15b HOV Lane Ends (overhead) Under Development
R3-15c HOV Lane Ends (overhead) Under Development
R3-15d Preferential Lane Ahead or Ends (overhead) Under Development
R3-15e Preferential Lane Ahead or Ends (overhead) Under Development
R3-17 Bike Lane Under Development
R3-17aP Ahead (plaque) Revised Size Under Development
R3-17bP Ends (plaque) Revised Size Under Development
R3-18 Movement Prohibition - No U or Left Turn Under Development
R3-19 Lane for Left Turn Only New Sign 9/27/2024
R3-19a Lane for U Turn Only New Sign 9/27/2024
R3-19b Lane for U and Left Turns Only New Sign 9/27/2024
R3-20 Begin Right (Left) Turn Lane Under Development
R3-23 All Turns from Right Lane Under Development
R3-23a U Turn from Right Lane Under Development
R3-24 All Turns Directional (Oblique) Under Development
R3-24a U and Left Turns Directional (Oblique) Under Development
R3-24b U Turn Directional (Oblique) Under Development
R3-25 All Turns Directional Under Development
R3-25a U and Left Turns Directional Under Development
R3-25b U Turn Directional Under Development
R3-26 U and Left Turns Directional (Through) Under Development
R3-26a U Turn Directional (Through) Under Development
R3-27 Movement Prohibition - No Straight Through Under Development
R3-28 Toll Rate Under Development
R3-29P Pay Toll (plaque) Under Development
R3-30P Take Ticket (plaque) Under Development
R3-31 ETC Account Only Redesignated Under Development
R3-32P No Cash (plaque) Redesignated Under Development
R3-33 Right (Left) Lane Must Exit Under Development
R3-33a Right (Left) Lane Must Exit New Sign 9/27/2024
R3-40 Priced Managed Lane Vehicle Occupancy Definition (post-mounted) Under Development
R3-42 Priced Managed Lane Ends (post-mounted) Under Development
R3-42a Priced Managed Lane Ends Advance (post-mounted) Under Development
R3-42b Priced Managed Lane Restriction Ends (post-mounted) Under Development
R3-42c Priced Managed Lane Restriction Ends Advance (post-mounted) Under Development
R3-43 Priced Managed Lane Vehicle Occupancy Definition Under Development
R3-44 Priced Managed Lane Operation (overhead) Under Development
R3-44a Priced Managed Lane Operation (overhead) Under Development
R3-44b Priced Managed Lane Operation (overhead) New Sign 9/27/2024
R3-45 Priced Managed Lane Ends (overhead) Under Development
R3-45a Priced Managed Lane Restriction Ends (overhead) Under Development
R3-48 Priced Managed Lane Toll Rate Under Development
R3-48a Priced Managed Lane Toll Rate Under Development
R3-51 Part-Time Travel on Shoulder Operation New Sign 9/27/2024
R3-51aP No Trucks (plaque) New Sign 9/27/2024
R3-51bP No Trucks or Buses (plaque) New Sign 9/27/2024
R3-51cP Emergency Stopping Only Other Times (plaque) New Sign 9/27/2024
R3-51d Part-Time Travel on Shoulder Variable Operation New Sign 9/27/2024
R3-51e Part-Time Travel on Shoulder on Green Arrow New Sign 9/27/2024
R3-52 Part-Time Travel on Shoulder Ends New Sign 9/27/2024
R3-52a Part-Time Travel on Shoulder Ends Advance New Sign 9/27/2024
R3-52b Shoulder Must Exit Advance New Sign 9/27/2024
R3-52c Part-Time Travel on Shoulder Begins Advance New Sign 9/27/2024
R3-56 Begin Exit Lane New Sign 9/27/2024
R3-57P To Traffic on Shoulder (plaque) New Sign 9/27/2024
R4-1 Do Not Pass Under Development
R4-2 Pass With Care Under Development
R4-3 Slower Traffic Keep Right Under Development
R4-4 Begin Right Turn Lane Yield to Bikes Revised Under Development
R4-5 Trucks Use Right Lane Under Development
R4-7 Keep Right Under Development
R4-7a Keep Right Under Development
R4-7b Keep Right Under Development
R4-7c Narrow Keep Right Under Development
R4-8 Keep Left Under Development
R4-8a Keep Left Under Development
R4-8b Keep Left Under Development
R4-8c Narrow Keep Left Under Development
R4-9 Stay in Lane Under Development
R4-10 Runaway Vehicles Only Under Development
R4-12 Slow Vehicles with XX or More Following Vehicles Must Use Turn-Out Under Development
R4-13 Slow Vehicles Must Use Turn-Out Ahead Under Development
R4-14 Slow Vehicles Must Turn Out Under Development
R4-16 Keep Right Except to Pass Under Development
R4-17 Do Not Drive on Shoulder Under Development
R4-18 Do Not Pass on Shoulder New Sign 9/27/2024
R4-19 Bicycle Passing Clearance New Sign 9/27/2024
R4-20 All Traffic New Sign 9/27/2024
R4-21 Right (Left) Turn Only New Sign 9/27/2024
R5-1 Do Not Enter Under Development
R5-1a Wrong Way Under Development
R5-1b Bicycle Wrong Way Under Development
R5-2 No Trucks Under Development
R5-2aP Except Local Delivery (plaque) New Sign 9/27/2024
R5-2b No Thru Trucks New Sign 9/27/2024
R5-3 No Motor Vehicles Under Development
R5-4 No Commercial Vehicles Under Development
R5-5 No Vehicles with Lugs Under Development
R5-6 No Bicycles Under Development
R5-7 No Non-Motorized Traffic Under Development
R5-8 No Motor-Driven Cycles Under Development
R5-10 No Pedestrians, Bicycles, Motor-Driven Cycles Redesignated Under Development
R5-10a No Pedestrians, Bicycles, Motor-Driven Cycles on Freeway New Sign 9/27/2024
R5-10b No Pedestrians or Bicycles Under Development
R5-10c No Pedestrians Under Development
R5-10dP On Freeway (plaque) New Sign 9/27/2024
R5-11 Authorized Vehicles Only Under Development
R5-12 No Thru Traffic New Sign 9/27/2024
R6-1 One Way New Size Added, Revised Size Under Development
R6-2 One Way Under Development
R6-3 Divided Highway Crossing Under Development
R6-3a Divided Highway Crossing Under Development
R6-5P Roundabout Circulation (plaque) Under Development
R6-6 BEGIN ONE WAY Under Development
R6-7 END ONE WAY Under Development
R7-1 No Parking Any Time Under Development
R7-2 No Parking (Part-Time) Under Development
R7-2a No Parking (Part-Time) Under Development
R7-3 No Parking Except Sundays and Holidays Under Development
R7-4 No Standing Any Time Under Development
R7-4a No Stopping Any Time New Sign 9/27/2024
R7-5 Parking Permitted (Time Limit, Part-Time) Under Development
R7-6 No Parking Loading Zone Under Development
R7-8 Reserved Parking - Accessible Under Development
R7-8aP Van Accessible (plaque) Redesignated Under Development
R7-9 No Parking Bike Lane Under Development
R7-9a No Parking Bike Lane Under Development
R7-10 Back-In Parking New Sign 9/27/2024
R7-20 Parking Fee Station, Multispace Meter Under Development
R7-21 Metered Parking Revised Under Development
R7-21aP Mobile Parking Payment (plaque) New Sign 9/27/2024
R7-22 Metered Parking Revised Under Development
R7-107 No Parking Bus Stop Under Development
R7-107a No Parking Bus Stop Under Development
R7-107b No Parking Bus Stop (with transit pictograph) New Sign 9/27/2024
R7-108 Parking Allowed (Time Limit, Part-Time) Under Development
R7-111 No Parking Except Electric Vehicles New Sign 9/27/2024
R7-111a No Parking Except Electric Vehicles (Part-Time) New Sign 9/27/2024
R7-112 Electric Vehicle Parking (Time Limit) New Sign 9/27/2024
R7-112a Electric Vehicle Parking (Time Limit, Part-Time) New Sign 9/27/2024
R7-112b Electric Vehicle Parking (Time Limit, Part-Time) New Sign 9/27/2024
R7-113 No Parking Except While Charging New Sign 9/27/2024
R7-113aP Vehicle Must be Plugged In (plaque) New Sign 9/27/2024
R7-113bP Vacate Stall When Charging Completed (plaque) New Sign 9/27/2024
R7-114 Vehicle Charging Only (Time Limit) New Sign 9/27/2024
R7-114a Vehicle Charging Only (Time Limit, Part-Time) New Sign 9/27/2024
R7-114b Vehicle Charging Only (Time Limit, Part-Time) New Sign 9/27/2024
R7-200 No Parking/Restricted Parking (combined sign) Under Development
R7-200a No Parking/Restricted Parking (combined sign) Under Development
R7-201aP Tow Away Zone (plaque) Under Development
R7-201P Tow Away Zone (plaque) Under Development
R7-202P This Side of Sign (plaque) Under Development
R7-203 Snow Emergency Route Revised Under Development
R8-1 No Parking on Pavement Under Development
R8-2 No Parking Except on Shoulder Under Development
R8-3 No Parking (symbol) Under Development
R8-3a No Parking Under Development
R8-3c On Pavement Under Development
R8-3d On Bridge Under Development
R8-3e On Tracks Under Development
R8-3f Except on Shoulder Under Development
R8-4 Emergency Parking Only Under Development
R8-5 No Stopping on Pavement Under Development
R8-6 No Stopping Except on Shoulder Under Development
R8-7 Emergency Stopping Only Under Development
R8-8 Do Not Stop On Tracks Under Development
R8-9 Tracks Out of Service Under Development
R8-10 Stop Here When Flashing Under Development
R8-10a Stop Here When Flashing Under Development
R9-1 Walk on Left Facing Traffic Under Development
R9-2 Cross Only at Crosswalks Under Development
R9-3 No Pedestrian Crossing (symbol) Under Development
R9-3a No Pedestrian Crossing Under Development
R9-3bP Use Crosswalk (plaque) Under Development
R9-3cP Ride With Traffic (plaque) Under Development
R9-4 No Hitchhiking (symbol) Under Development
R9-4a No Hitchhiking Under Development
R9-5 Bicycles Use Pedestrian Signal Under Development
R9-6 Bicycles Yield to Pedestrians Under Development
R9-7 Shared-Use Path Restriction Under Development
R9-13 No Skaters Under Development
R9-14 No Equestrians Under Development
R9-15 No Snowmobiles New Sign 9/27/2024
R9-16 No All-Terrain Vehicles New Sign 9/27/2024
R9-19P Except on Shoulder (plaque) New Sign 9/27/2024
R9-20 Bicycles May Use Allowed Use of Full Lane Redesignated and Revised Under Development
R9-21 Bicycles Use Shoulder Only New Sign 9/27/2024
R9-22 Bicycles Must Exit New Sign 9/27/2024
R9-23 Bicycle All Turns from Bike Lane New Sign 9/27/2024
R9-23a Bicycle Left Turn from Bike Lane New Sign 9/27/2024
R9-23b Bicycle Left Turn Must Use Turn Box New Sign 9/27/2024
R9-23c Bicycle Left Turn Must Use Turn Box (with arrow, oblique) New Sign 9/27/2024
R9-24 Bicycle All Turns (with arrow, oblique) New Sign 9/27/2024
R9-24a Bicycle All Turns (with arrow, horizontal) New Sign 9/27/2024
R9-25 Bicycle U and Left Turns (with arrow, oblique) New Sign 9/27/2024
R9-25a Bicycle U and Left Turns (with arrow, horizontal) New Sign 9/27/2024
R9-25b Bicycle U and Left Turns (with arrow, through) New Sign 9/27/2024
R9-26 Bicycle U Turn (with arrow, oblique) New Sign 9/27/2024
R9-26a Bicycle U Turn (with arrow, horizontal) New Sign 9/27/2024
R9-26b Bicycle U Turn (with arrow, through) New Sign 9/27/2024
R9-27 Bicycle Left Turn (with arrow, oblique) New Sign 9/27/2024
R9-27a Bicycle Left Turn (with arrow, horizontal) New Sign 9/27/2024
R9-27b Bicycle Left Turn (with arrow, through) New Sign 9/27/2024
R10-1 Cross Only on Green Under Development
R10-2 Cross Only on Walk Signal Under Development
R10-3 Push Button for Walk Signal Under Development
R10-3a Push Button to Cross Street - Wait for Walk Signal Under Development
R10-3b Push Button Educational Under Development
R10-3c Push Button Educational Under Development
R10-3d Push Button Educational - Two-Stage Crossing Under Development
R10-3e Push Button Educational - Countdown Signal Under Development
R10-3f Push Button Educational - Street Name Under Development
R10-3g Push Button Educational - Street Name Under Development
R10-3h Push Button Educational - Street Name - Two-Stage Crossing Under Development
R10-3i Push Button Educational - Countdown Signal - Street Name Under Development
R10-4 Push Button for Green Under Development
R10-4a Push Button - Wait for Green Under Development
R10-5 Left on Green Arrow Only Under Development
R10-6 Stop Here on Red Under Development
R10-6a Stop Here on Red Under Development
R10-7 Do Not Block Intersection Under Development
R10-8 Use Lane with Green Arrow Under Development
R10-10 Left (Right) Turn Signal Under Development
R10-10a U Turn Signal New Sign 9/27/2024
R10-10b Left (Right) Lane Signal New Sign 9/27/2024
R10-10c Left (Right) Turn Lane Signal New Sign 9/27/2024
R10-11 No Turn on Red Redesignated Under Development
R10-11a No Turn on Circular Red Redesignated Under Development
R10-11b No Turn on Red Under Development
R10-11c No Turn on Red Except From Right Lane Revised Size Under Development
R10-11d No Turn on Red From This Lane Under Development
R10-12 Left Turn Yield on Green Under Development
R10-12a Left Turn Yield on Flashing Yellow Arrow New Sign 9/27/2024
R10-12b Left Turn Yield to Bicycle New Sign 9/27/2024
R10-13 Emergency Signal Under Development
R10-14 Emergency Signal - Stop on Flashing Red Under Development
R10-14a Emergency Signal - Stop on Flashing Red (overhead) Under Development
R10-14b Stop Here on Flashing Red New Sign 9/27/2024
R10-15 Turning Vehicles Yield to Pedestrians Under Development
R10-15a Turning Vehicles Stop for Pedestrians New Sign 9/27/2024
R10-16 U-Turn Yield to Right Turn Under Development
R10-17a Right on Red Arrow After Stop Under Development
R10-18 Traffic Laws Photo Enforced Under Development
R10-18a Traffic Signal Photo Enforced New Sign 9/27/2024
R10-19aP Photo Enforced (plaque) Under Development
R10-19P Photo Enforced (symbol plaque) Under Development
R10-20aP MON-FRI (and times) (3 lines) (plaque) Under Development
R10-22 Bicycle Detector Under Development
R10-23 Crosswalk - Stop on Red Under Development
R10-23a STOP ON RED - YIELD ON FLASHING RED AFTER STOP New Sign 9/27/2024
R10-24 Bike Push Button for Green Light Under Development
R10-25 Push Button to Turn On For Warning Lights - Wait for Gap Revised Under Development
R10-26 Bike Push Button for Green Light (arrow) Under Development
R10-27 Left Turn Yield on Flashing Red Arrow After Stop Under Development
R10-28 XX Vehicles Per Green Under Development
R10-29 XX Vehicles Per Green Each Lane Under Development
R10-30 Right Turn on Red Must Yield to U-Turn Under Development
R10-31P At Signal (plaque) Under Development
R10-32P Push Button for 2 Seconds for Extra Crossing Time Under Development
R10-40 Bicycle Signal Mandatory Movement (Turn) New Sign 9/27/2024
R10-40a Bicycle Signal Mandatory Movement (Thru) New Sign 9/27/2024
R10-41 Bicycle Signal Optional Movement (Thru and Turn) New Sign 9/27/2024
R10-41a Bicycle Signal Optional Movement (Left and Right Turns) New Sign 9/27/2024
R10-41b Bicycle Signal Optional Movement (All) New Sign 9/27/2024
R10-41c Bicycle Signal Optional Movement (Left and Thru) New Sign 9/27/2024
R11-1 Keep Off Median Under Development
R11-2 Road Closed Under Development
R11-2a Street Closed New Sign 9/27/2024
R11-2b Bridge Out New Sign 9/27/2024
R11-2c Path Closed New Sign 9/27/2024
R11-3 Road Closed - Local Traffic Only Redesignated Under Development
R11-3a Street Closed - Local Traffic Only New Sign 9/27/2024
R11-3b Bridge Out - Local Traffic Only Under Development
R11-4 Road Closed to Thru Traffic Under Development
R12-1 Weight Limit Under Development
R12-2 Weight Limit Under Development
R12-4 Weight Limit Under Development
R12-5 Weight Limit Under Development
R12-6 Weight Limit - Specialized Hauling Vehicles New Sign 9/27/2024
R12-7 Weight Limit - Emergency Vehicles New Sign 9/27/2024
R12-7aP Weight Limit - Emergency Vehicles (plaque) New Sign 9/27/2024
R13-1 Vehicle Inspection Area Revised Under Development
R14-1 Truck Route Under Development
R14-2 Hazardous Material Under Development
R14-3 Hazardous Material Under Development
R14-4 National Network Route Under Development
R14-5 National Network Prohibition Under Development
R15-1 Grade Crossing (Crossbuck) Under Development
R15-2P Number of Tracks (plaque) Under Development
R15-3P Exempt (plaque) Under Development
R15-4a Light Rail Only Right Lane Under Development
R15-4b Light Rail Only Left Lane Under Development
R15-4c Light Rail Only Center Lane Under Development
R15-5 Light Rail Do Not Pass Under Development
R15-5a Do Not Pass Stopped Train Under Development
R15-6 No Motor Vehicles On Tracks Under Development
R15-6a Do Not Drive On Tracks Under Development
R15-7 Light Rail Divided Highway Symbol Under Development
R15-7a Light Rail Divided Highway Symbol (T-Intersection) Under Development
R15-8 Look Under Development
R16-3 Move Over or Reduce Speed New Sign 9/27/2024
R16-4 Minor Crashes Move Vehicles from Travel Lanes Revised Under Development
R16-5 Lights On When Using Wipers Under Development
R16-6 Lights On When Raining Under Development
R16-7 Turn On Headlights Next XX Miles Under Development
R16-8 Turn On Headlights Under Development
R16-9 Check Headlights Under Development
R16-10 Begin Daytime Headlight Section Under Development
R16-11 End Daytime Headlight Section Under Development
R16-15 No Hand-Held Phone Use By Driver New Sign 9/27/2024
R16-15a No Hand-Held Phone Use By Driver New Sign 9/27/2024

Warning Signs and Object Markers

Sign Designation
Sign
Notes
Date Posted
W1-1 Horizontal Alignment - Turn Under Development
W1-2 Horizontal Alignment - Curve Under Development
W1-3 Horizontal Alignment - Reverse Turn Under Development
W1-4 Horizontal Alignment - Reverse Curve Under Development
W1-5 Horizontal Alignment - Winding Road Under Development
W1-6 Large Arrow (1-direction) Under Development
W1-7 Large Arrow (2-direction) Under Development
W1-8 Chevron Alignment Under Development
W1-10 Combination Horizontal Alignment/Intersection Under Development
W1-10a Combination Horizontal Alignment/Intersection Under Development
W1-10b Combination Horizontal Alignment/Intersection Under Development
W1-10c Combination Horizontal Alignment/Intersection Under Development
W1-10d Combination Horizontal Alignment/Intersection Under Development
W1-10e Combination Horizontal Alignment/Intersection Under Development
W1-11 Hairpin Curve Under Development
W1-13 Truck Rollover Revised Under Development
W1-15 270-degree Curve Under Development
W2-1 Intersection Warning - Crossroad Under Development
W2-2 Intersection Warning - Side Road Under Development
W2-3 Intersection Warning - Oblique Side Road (Obtuse) Under Development
W2-3a Intersection Warning - Oblique Side Road (Acute) New Sign 6/7/24
W2-4 Intersection Warning - T-Intersection Under Development
W2-5 Intersection Warning - Y-Intersection Under Development
W2-6 Intersection Warning - Circular Under Development
W2-7 Intersection Warning - Offset Side Roads Under Development
W2-8 Intersection Warning - Side Roads Under Development
W2-10 Traffic Entering When Flashing New Sign 6/7/24
W2-11 Traffic Approaching When Flashing New Sign 6/7/24
W3-1 Stop Ahead Under Development
W3-2 Yield Ahead Under Development
W3-3 Signal Ahead Under Development
W3-4 Be Prepared to Stop Under Development
W3-5 Reduced Speed Limit Ahead Under Development
W3-5a XX MPH Speed Zone Ahead Under Development
W3-5b Variable Speed Zone Ahead New Sign 6/7/24
W3-5c XX MPH Truck Speed Zone Ahead New Sign 6/7/24
W3-6 Draw Bridge Under Development
W3-7 Ramp Meter Ahead Under Development
W3-8 Ramp Metered When Flashing Under Development
W3-9 Traffic Using Shoulder New Sign 6/7/24
W4-1 Merge Under Development
W4-2 Lane Ends Under Development
W4-3 Added Lane Under Development
W4-4P Cross Traffic Does Not Stop (plaque) Under Development
W4-4aP Traffic From Left (Right) Does Not Stop (plaque) Under Development
W4-4bP Oncoming Traffic Does Not Stop (plaque) Under Development
W4-5 Entering Roadway Merge Under Development
W4-5aP No Merge Area (plaque) Redesignated Under Development
W4-6 Entering Roadway Added Lane Under Development
W4-7 Heavy Merge From Right (Left) New Sign 6/7/24
W4-8 Single-Lane Transition New Sign 6/7/24
W5-1 Road Narrows Under Development
W5-2 Narrow Bridge Under Development
W5-2a Narrow Underpass New Sign 6/7/24
W5-3 One Lane Bridge Under Development
W5-3a One Lane Underpass New Sign 6/7/24
W5-4 Ramp Narrows Under Development
W5-4a Path Narrows Under Development
W6-1 Divided Highway Under Development
W6-2 Divided Highway Ends Under Development
W6-3 Two-Way Traffic Under Development
W6-5 Two-Way Traffic (3-Lane) New Sign 6/7/24
W6-5a Two-Way Traffic (3-Lane) New Sign 6/7/24
W7-1 Hill Under Development
W7-1a Hill with Grade Under Development
W7-2P Use Low Gear (plaque) Under Development
W7-2bP Trucks Use Lower Gear (plaque) Under Development
W7-3P XX% Grade (plaque) Under Development
W7-3aP Next XX Miles (plaque) Under Development
W7-3bP XX% Grade XX Miles (plaque) Under Development
W7-4 Runaway Truck Ramp XX Miles Under Development
W7-4b Runaway Truck Ramp Entrance Direction with Arrow Under Development
W7-4c Truck Escape Ramp Under Development
W7-4dP Sand (plaque) Under Development
W7-4eP Gravel (plaque) Under Development
W7-4fP Paved (plaque) Under Development
W7-5 Hill (Bicycle) Under Development
W7-6 Hill Blocks View Under Development
W8-1 Bump Under Development
W8-2 Dip Under Development
W8-3 Pavement Ends Under Development
W8-4 Soft Shoulder Under Development
W8-5 Slippery When Wet Under Development
W8-5P When Wet (plaque) Under Development
W8-5aP Ice (plaque) Under Development
W8-5bP Steel Deck (plaque) Under Development
W8-5cP Excess Oil (plaque) Under Development
W8-6 Truck Crossing Under Development
W8-7 Loose Gravel Under Development
W8-8 Rough Road Under Development
W8-9 Low Shoulder Under Development
W8-10 Bicycle Surface Condition Under Development
W8-10P Slippery When Wet (plaque) Under Development
W8-11 Uneven Lanes Under Development
W8-12 No Center Line Under Development
W8-13 Bridge Ices Before Road Under Development
W8-14 Fallen Rocks Under Development
W8-15 Grooved Pavement Under Development
W8-15aP Motorcycle (plaque) Under Development
W8-16 Metal Bridge Deck Under Development
W8-17 Shoulder Drop-Off Under Development
W8-17P Shoulder Drop-Off (plaque) Under Development
W8-18 Road May Flood Under Development
W8-19 Depth Gauge Under Development
W8-21 Gusty Winds Area Under Development
W8-22 Fog Area Under Development
W8-23 No Shoulder Under Development
W8-25 Shoulder Ends Under Development
W8-26 Road Ends Advance New Sign 6/7/24
W8-26a Street Ends Advance New Sign 6/7/24
W9-1 Right (Left) Lane Ends Under Development
W9-4 Lanes Merge 6/7/24
W9-5 Bicycle Lane Ends 6/7/24
W9-5a Bicycles Merging 6/7/24
W9-6 Pay Toll XX Miles Cars (price) Under Development
W9-6a Stop Ahead Pay Toll Cars (price) Under Development
W9-6bP Pay Toll XX Miles Cars (price) (plaque) Redesignated Under Development
W9-6cP Stop Ahead Pay Toll (plaque) Redesignated Under Development
W9-6dP Stop Ahead Pay Toll (plaque) New Sign 6/7/24
W9-6e Take Ticket XX Miles New Sign 6/7/24
W9-6f Stop Ahead Take Ticket New Sign 6/7/24
W9-6gP Take Ticket XX Miles (plaque) New Sign 6/7/24
W9-6hP Stop Ahead Take Ticket (plaque) New Sign 6/7/24
W9-7 Right (Left) Lane for Exit Only Ahead Revised Under Development
W10-1 Grade Crossing Advance Warning Under Development
W10-1aP Exempt (plaque) Under Development
W10-2 Grade Crossing Advance Warning - Crossroad with Grade Crossing Under Development
W10-3 Grade Crossing Advance Warning - Side Road with Grade Crossing Under Development
W10-4 Grade Crossing Advance Warning - T-Intersection with Grade Crossing Under Development
W10-5 Low Ground Clearance Under Development
W10-5P Low Ground Clearance (plaque) Under Development
W10-7 Light Rail Activated Blank-Out Under Development
W10-8 Trains May Exceed 80 mph Under Development
W10-9 No Train Horn Under Development
W10-9P No Train Horn (plaque) Under Development
W10-11 Storage Space Under Development
W10-11a Storage Space Ahead Under Development
W10-11b Storage Space Behind Under Development
W10-12 Skewed Crossing Under Development
W10-13P No Gates or Lights (plaque) Under Development
W10-14aP Use Next Crossing (plaque) Under Development
W10-14P Next Crossing (plaque) Under Development
W10-15P Rough Crossing (plaque) Under Development
W10-16 Another Train Coming (Blank-Out) New Sign 6/7/24
W10-21 Busway Crossing New Sign 6/7/24
W10-21aP Signal Ahead (plaque) New Sign 6/7/24
W11-1 Bicycle Under Development
W11-2 Pedestrian Under Development
W11-3 Large Animal - Deer Under Development
W11-4 Large Animal - Cattle Under Development
W11-5 Farm Vehicle Under Development
W11-6 Snowmobile Under Development
W11-7 Equestrian Under Development
W11-8 Emergency Vehicle Under Development
W11-9 Handicapped Under Development
W11-10 Truck Under Development
W11-11 Golf Cart Under Development
W11-12P Emergency Signal Ahead (plaque) Under Development
W11-14 Horse-Drawn Vehicle Under Development
W11-15 Trail Crossing Under Development
W11-15a Trail Crossing Under Development
W11-15P Trail Crossing (plaque) Under Development
W11-16 Large Animal - Bear Under Development
W11-17 Large Animal - Sheep Under Development
W11-18 Large Animal - Bighorn Sheep Under Development
W11-19 Large Animal - Donkey Under Development
W11-20 Large Animal - Elk Under Development
W11-21 Large Animal - Moose Under Development
W11-22 Large Animal - Wild Horse Under Development
W12-1 Double Arrow Under Development
W12-2 Low Clearance Advance Under Development
W12-2a Low Clearance Overhead Under Development
W12-2b Low Clearance - Lane Overhead New Sign 6/7/24
W13-1P Advisory Speed (plaque) Under Development
W13-1aP Advisory Speed Confirmation (plaque) New Sign 6/7/24
W13-2 Advisory Exit Speed Under Development
W13-3 Advisory Ramp Speed Under Development
W13-6 Combination Horizontal Alignment/ Advisory Exit Speed - 270-degree Loop Revised Size Under Development
W13-7 Combination Horizontal Alignment/ Advisory Ramp Speed - 270-degree Loop Revised Size Under Development
W13-8 Combination Horizontal Alignment/ Advisory Exit Speed - 180-degree Loop New Sign 6/7/24
W13-9 Combination Horizontal Alignment/ Advisory Ramp Speed - 180-degree Loop New Sign 6/7/24
W13-10 Combination Horizontal Alignment/ Advisory Exit Speed - Turn New Sign 6/7/24
W13-11 Combination Horizontal Alignment/ Advisory Ramp Speed - Turn New Sign 6/7/24
W13-12 Combination Horizontal Alignment/ Advisory Exit Speed - Truck Rollover New Sign 6/7/24
W13-13 Combination Horizontal Alignment/ Advisory Ramp Speed - Truck Rollover New Sign 6/7/24
W13-20 Vehicle Speed Feedback New Sign 6/7/24
W13-20aP Vehicle Speed Feedback (plaque) New Sign 6/7/24
W14-1 Dead End Under Development
W14-1a Dead End (with arrow) Revised Size Under Development
W14-2 No Outlet Under Development
W14-2a No Outlet (with arrow) Revised Size Under Development
W14-3 No Passing Zone Under Development
W15-1 Playground Under Development
W16-1P In Road (plaque) New Sign 6/7/24
W16-1aP In Street (plaque) New Sign 6/7/24
W16-2P XX Feet (2-line plaque) Under Development
W16-2aP XX Ft (1-line plaque) Under Development
W16-3P XX Miles (2-line plaque) Under Development
W16-3aP XX Miles (1-line plaque) Under Development
W16-4P Next XX Feet (plaque) Under Development
W16-5P Directional Advance Arrow (plaque) Revised Size Under Development
W16-6P Advance Turn Directional Arrow (plaque) Revised Size Under Development
W16-7P Downward Diagonal Arrow (plaque) Revised Size Under Development
W16-7aP Dual Downward Diagonal Arrow (plaque) New Sign 6/7/24
W16-8P Advance Street Name (1-line plaque) Under Development
W16-8aP Advance Street Name (2-line plaque) Under Development
W16-9P Ahead (plaque) Under Development
W16-10P Photo Enforced (symbol plaque) Under Development
W16-10aP Photo Enforced (plaque) Under Development
W16-11P High-Occupancy Vehicles (plaque) Under Development
W16-12P Traffic Circle (plaque) Under Development
W16-12aP Roundabout (plaque) Redesignated Under Development
W16-13P When Flashing (plaque) Under Development
W16-15P New (plaque) Under Development
W16-16P Last Exit Before Toll (1-line plaque) Under Development
W16-16aP Last Exit Before Toll (2-line plaque) New Sign 6/7/24
W16-17P Toll (plaque) Redesignated Under Development
W16-18P NOTICE (plaque) Under Development
W16-19P LAST IN CORRIDOR (plaque) New Sign 6/7/24
W16-20P EXCEPT BICYCLES (plaque) New Sign 6/7/24
W16-21P 2-Way Bicycle Cross Traffic (plaque) New Sign 6/7/24
W17-1 Speed Hump Under Development
W18-1 No Traffic Signs Under Development
W19-1 Freeway Ends XX Miles Under Development
W19-2 Expressway Ends XX Miles Under Development
W19-3 Freeway Ends Under Development
W19-4 Expressway Ends Under Development
W19-5 All Traffic Must Exit Under Development
W23-2 New Traffic Pattern Ahead Under Development
W23-2a New Signal Operation Ahead New Sign 6/7/24
W25-1 Oncoming Traffic Has Extended Green Under Development
W25-2 Oncoming Traffic May Have Extended Green Under Development
W26-1 Watch For Stopped Traffic New Sign 6/7/24
OM1-1 Object Marker Type 1 Under Development
OM1-2 Object Marker Type 1 Under Development
OM1-3 Object Marker Type 1 Under Development
OM2-1V Object Marker Type 2 Under Development
OM2-1H Object Marker Type 2 Under Development
OM2-2V Object Marker Type 2 Under Development
OM2-2H Object Marker Type 2 Under Development
OM3-L Object Marker Type 3 Under Development
OM3-C Object Marker Type 3 Under Development
OM3-R Object Marker Type 3 Under Development
OM4-1 Object Marker Type 4 Under Development
OM4-2 Object Marker Type 4 Under Development
OM4-3 Object Marker Type 4 Under Development

Guide Signs

Sign Designation
Sign
Notes
Date Posted
M1-1 Interstate Route (1, 2 digits) Under Development
M1-1a Interstate Route (1, 2 digits) New Sign Under Development
M1-2 Off-Interstate Route - Loop (1, 2 digits) Under Development
M1-3 Off-Interstate Route - Spur (1, 2 digits) Under Development
M1-4 U.S. Route (1, 2 digits) Under Development
M1-5 State Route (1, 2 digits) Under Development
M1-6 County Route Under Development
M1-7 Forest Route Under Development
M1-8 State or Local Bicycle Route Under Development
M1-8a State or Local Bicycle Route Under Development
M1-8b Non-Numbered Bicycle Route (2 lines) New Sign Under Development
M1-8c Non-Numbered Bicycle Route (3 lines) New Sign Under Development
M1-9 U.S. Bicycle Route Revised Under Development
M1-10 Eisenhower Interstate System Under Development
M1-10a Eisenhower Interstate System Under Development
M2-1P Junction (plaque) Redesignated Under Development
M2-2 Combination Junction (2 route signs) Under Development
M3-1P Cardinal Direction - North (plaque) Redesignated Under Development
M3-2P Cardinal Direction - East (plaque) Redesignated Under Development
M3-3P Cardinal Direction -South (plaque) Redesignated Under Development
M3-4P Cardinal Direction - West (plaque) Redesignated Under Development
M4-1aP Alternate (plaque) Redesignated Under Development
M4-1P Alternate (plaque) Redesignated Under Development
M4-2P By-Pass (plaque) Redesignated Under Development
M4-3P Business (plaque) Redesignated Under Development
M4-4P Truck (plaque) Redesignated Under Development
M4-5P To (plaque) Redesignated Under Development
M4-6P End (plaque) Redesignated Under Development
M4-7P Temporary (plaque) Redesignated Under Development
M4-7aP Temporary (plaque) Redesignated Under Development
M4-11 Emergency Route New Sign Under Development
M4-11a Emergency Route New Sign Under Development
M4-11bP Emergency Route To (plaque) New Sign Under Development
M4-11cP Emergency Route To (plaque) New Sign Under Development
M4-12 End Emergency Route New Sign Under Development
M4-14P Begin (plaque) Redesignated Under Development
M4-17 Toll Collector Symbol Panel Under Development
M4-18 Exact Change Symbol Panel Under Development
M5-1P Advance Turn Arrow (plaque) Redesignated Under Development
M5-2P Advance Turn Arrow - Oblique (plaque) Redesignated Under Development
M5-3P Advance Turn Arrow - Circular Intersection (plaque) Redesignated Under Development
M5-4P Lane Designation - Left Lane (plaque) Redesignated Under Development
M5-5P Lane Designation - Center Lane (plaque) Redesignated Under Development
M5-6P Lane Designation - Right Lane (plaque) Redesignated Under Development
M6-1P Directional Arrow - Turn (plaque) Redesignated Under Development
M6-2aP Directional Arrow - Oblique, Downward (plaque) Redesignated Under Development
M6-2P Directional Arrow - Oblique (plaque) Redesignated Under Development
M6-3P Directional Arrow - Through (plaque) Redesignated Under Development
M6-4P Directional Arrow - Turn (Two-Way) (plaque) Redesignated Under Development
M6-5P Directional Arrow - Oblique (Two-Way) (plaque) Redesignated Under Development
M6-6P Directional Arrow - Through and Turn (plaque) Redesignated Under Development
M6-7P Directional Arrow - Through and Oblique (plaque) Redesignated Under Development
M10-1 National Scenic Byway Redesignated Under Development
M10-1aP National Scenic Byway (plaque) Redesignated Under Development
M10-2 Byway Identification New Sign Under Development
M10-2aP Byway Identification (plaque) New Sign Under Development
M10-3 State Scenic Byway System New Sign Under Development
M10-3a State Scenic Byway - Simple Graphic and Byway Identification New Sign Under Development
M10-3bP Scenic Byway (plaque) New Sign Under Development
M11-1 National Historic Trail - Identification New Sign Under Development
M11-1aP National Historic Trail - Historic Route (plaque) New Sign Under Development
M11-1bP National Historic Trail - Crossing (plaque) New Sign Under Development
M11-1cP National Historic Trail - Auto Tour Route (plaque) New Sign Under Development
M11-1dP National Historic Trail - Distance (plaque) New Sign Under Development
D1-1 Destination (1 line) Under Development
D1-1a Destination and Distance (1 line) Under Development
D1-1b Bicycle Destination (1 line) Under Development
D1-1c Bicycle Destination and Distance (1 line) Under Development
D1-1d Circular Intersection Destination (1 line) Under Development
D1-1e Circular Intersection Departure Guide Under Development
D1-2 Destination (2 lines) Under Development
D1-2a Destination and Distance (2 lines) Under Development
D1-2b Bicycle Destination (2 lines) Under Development
D1-2c Bicycle Destination and Distance (2 lines) Under Development
D1-2d Circular Intersection Destination (2 lines) Under Development
D1-3 Destination (3 lines) Under Development
D1-3a Destination and Distance (3 lines) Under Development
D1-3b Bicycle Destination (3 lines) Under Development
D1-3c Bicycle Destination and Distance (3 lines) Under Development
D1-3d Circular Intersection Destination (3 lines) Under Development
D1-5 Circular Intersection Diagrammatic Destination Under Development
D1-5a Circular Intersection Diagrammatic Destination, Right-Turn Bypass Under Development
D2-1 Distance (1 line) Under Development
D2-1a Bike Route Destination and Distance (1 Line) New Sign Under Development
D2-2 Distance (2 lines) Under Development
D2-2a Bike Route Destination and Distance (2 Lines) New Sign Under Development
D2-3 Distance (3 lines) Under Development
D2-3a Bike Route Destination and Distance (3 Lines) New Sign Under Development
D3-1 Street Name New Size Added Under Development
D3-1a Street Name with Route Sign New Size Added Under Development
D3-2 Advance Street Name Under Development
D4-1 Parking Area Directional Under Development
D4-2 Park - Ride Under Development
D4-3 Bicycle Parking Area Directional Revised Under Development
D4-4 Bicycle Sharing Station Directional New Sign Under Development
D4-4a Bicycle Lockers Directional New Sign Under Development
D5-1 Rest Area Advance Under Development
D5-1a Rest Area Advance Direction Under Development
D5-2 Rest Area Entrance Direction Under Development
D5-2a Rest Area Gore Under Development
D5-5 Rest Area Directional Under Development
D5-6 Next Rest Area Under Development
D5-7 Rest Area Tourist Info Center Advance Under Development
D5-7a Rest Area Tourist Info Center Advance Direction Redesignated Under Development
D5-8 Rest Area Tourist Info Center Entrance Direction Under Development
D5-9 Parking Area Advance New Sign Under Development
D5-9a Parking Area Entrance Direction New Sign Under Development
D5-9b Parking Area Gore New Sign Under Development
D5-10 Picnic Area (Roadside Table, Roadside Park) Advance New Sign Under Development
D5-10a Picnic Area (Roadside Table, Roadside Park) Entrance Direction New Sign Under Development
D5-10b Picnic Area (Roadside Table, Roadside Park) Gore New Sign Under Development
D5-11 Scenic Area (Scenic View, Scenic Overlook) Advance New Sign Under Development
D5-11a Scenic Area (Scenic View, Scenic Overlook) Entrance Direction New Sign Under Development
D5-11b Scenic Area (Scenic View, Scenic Overlook) Gore New Sign Under Development
D5-12 Interstate Oasis Revised Size Under Development
D5-12aP Interstate Oasis (plaque) Redesignated Under Development
D5-12b Interstate Oasis Directional New Sign Under Development
D5-13 Brake Check Area Advance Under Development
D5-14 Brake Check Area Entrance Direction Under Development
D5-15 Chain-Up Area Advance Under Development
D5-16 Chain-Up Area Entrance Direction Under Development
D8-1 Advance Weigh Station Distance Under Development
D8-1a Weigh Station Ahead New Sign Under Development
D8-2 Weigh Station Advance Direction Under Development
D8-3 Weigh Station Entrance Direction Under Development
D9-1 Telephone Under Development
D9-2 Hospital Under Development
D9-3 Camping Under Development
D9-4 Litter Container Under Development
D9-6 International Symbol of Accessibility Under Development
D9-6P Van Accessible (plaque) Under Development
D9-7 Gas Under Development
D9-8 Food Under Development
D9-9 Lodging Under Development
D9-10 Tourist Information Under Development
D9-11 Diesel Fuel Under Development
D9-11a Alternative Fuel - Compressed Natural Gas Under Development
D9-11b Electric Vehicle Charging Revised Under Development
D9-11bP Electric Vehicle Charging (plaque) Under Development
D9-11c Alternative Fuel - Ethanol Under Development
D9-11d Alternative Fuel - Liquefied Natural Gas New Sign Under Development
D9-11e Alternative Fuel - Liquefied Petroleum Gas New Sign Under Development
D9-11f Alternative Fuel - Hydrogen New Sign Under Development
D9-11g Alternative Fuel - Biofuel New Sign Under Development
D9-12 RV Sanitary Station Under Development
D9-13 Emergency Medical Services Under Development
D9-13aP Hospital (plaque) Under Development
D9-13bP Ambulance Station (plaque) Under Development
D9-13cP Emergency Medical Care (plaque) Under Development
D9-13dP Trauma Center (plaque) Under Development
D9-14 Police Under Development
D9-16 Truck Parking Under Development
D9-16aP Truck External Power (plaque) New Sign Under Development
D9-16b Truck Parking Availability - Exit Number New Sign Under Development
D9-16c Truck Parking Availability - Distance New Sign Under Development
D9-16d Truck Parking Availability - Rest Areas New Sign Under Development
D9-16e Truck Parking Availability - Combined New Sign Under Development
D9-17a Next EV Charging XX Miles Under Development
D9-17P Next Services Advance (plaque) New Sign Under Development
D9-18 General Services (up to 6 symbols) with Exit Number Redesignated and Revised Under Development
D9-18a General Services with Exit Number Redesignated Under Development
D9-18b General Services (up to 6 symbols) with Action Message Redesignated and Revised Under Development
D9-18c General Services with Action Message Revised Under Development
D9-18dP Rural Interchange General Services (up to 3 symbols) (plaque) New Sign Under Development
D9-18eP Rural Interchange General Services (1 line) (plaque) New Sign Under Development
D9-18fP Rural Interchange General Services (2 lines) (plaque) New Sign Under Development
D9-19 Alternative Fuels Corridor New Sign Under Development
D9-19aP Alternative Fuels Corridor (1 line) (plaque) New Sign Under Development
D9-19bP Alternative Fuels Corridor (2 lines) (plaque) New Sign Under Development
D9-20 Pharmacy Under Development
D9-20aP 24-Hour (plaque) Under Development
D9-21 Telecommunication Device for the Deaf Under Development
D9-22 Wireless Internet Under Development
D10-1 Reference Location (1 digit) Under Development
D10-1a Intermediate Reference Location (2 digits) Under Development
D10-2 Reference Location (2 digits) Under Development
D10-2a Intermediate Reference Location (3 digits) Under Development
D10-3 Reference Location (3 digits) Under Development
D10-3a Intermediate Reference Location (4 digits) Under Development
D10-4 Enhanced Reference Location New Size Added Under Development
D10-5 Intermediate Enhanced Reference Location New Size Added Under Development
D11-1 Bike Route Under Development
D11-1bP Bike Route (plaque) Under Development
D11-1c Bike Route with Destination Under Development
D11-10a Shared-Use Path Destination (1 line) New Sign Under Development
D11-10b Shared-Use Path Destination (2 lines) New Sign Under Development
D11-10c Shared-Use Path Destination (3 lines) New Sign Under Development
D11-10d Shared-Use Path Destination and Distance (1 line) New Sign Under Development
D11-10e Shared-Use Path Destination and Distance (2 lines) New Sign Under Development
D11-10f Shared-Use Path Destination and Distance (3 lines) New Sign Under Development
D11-11 Bicycles Directional Redesignated Under Development
D11-12 Pedestrians Directional Redesignated Under Development
D11-13 Skaters Directional Redesignated Under Development
D11-14 Equestrians Directional Redesignated Under Development
D11-20 Bicycle Left Turn May Use Turn Box New Sign Under Development
D11-20a Bicycle Left Turn Box (with arrow, oblique) New Sign Under Development
D12-1 Radio-Weather Information Under Development
D12-1a Radio-Traffic Information New Sign Under Development
D12-1bP Urgent Message When Flashing (plaque) New Sign Under Development
D12-2 Carpool Information Under Development
D12-3 Channel 9 Monitored Under Development
D12-4 Emergency Call 911 Under Development
D12-5 Travel Info Call 511 (Pictograph) Revised Size Under Development
D12-5a Travel Info Call 511 Under Development
D12-6 Roadside Assistance New Sign Under Development
D13-1 Crossover (Directional) Under Development
D13-2 Advance Crossover Under Development
D13-3 Freeway Entrance Under Development
D13-3a Freeway Entrance (Directional) Under Development
D15-1 Combination Lane Use / Destination Under Development
D17-1 Next Truck Lane XX Miles Under Development
D17-2 Advance Truck Lane Under Development
D17-3 Next Passing Lane New Sign Under Development
D17-4 Advance Passing Lane New Sign Under Development
D17-5 Advance Emergency Turn-Out New Sign Under Development
D17-6 Emergency Turn-Out (Directional) New Sign Under Development
D17-7 Advance Slow Vehicle Turn-Out Revised Size Under Development
I1-1 Traffic Signal Speed Under Development
I2-1 Jurisdictional Boundary Redesignated, New Size Added Under Development
I2-2 Geographical Feature Redesignated, New Size Added Under Development
I2-3 Grade Separation Identification New Sign Under Development
I2-3a Grade Separation Identification (2 lines) New Sign Under Development
I2-4 Future Interstate Corridor New Sign Under Development
I2-4a Future I-XX Corridor New Sign Under Development
I2-5 Project Information New Sign Under Development
I3-5 Airport Redesignated Under Development
I3-6 Bus Station Redesignated Under Development
I3-7 Train Station Redesignated Under Development
I3-8 Light Rail Transit Station Redesignated Under Development
I3-9 Vehicle Ferry Terminal Redesignated Under Development
I3-10 Passenger Only Ferry Terminal New Sign Under Development
I3-10P Ferry (Plaque) New Sign Under Development
I4-1 Library Redesignated Under Development
I4-2 Recycling Center Redesignated and Revised Under Development
I13-1 Emergency Notificaiton Redesignated and Revised Under Development
I13-2 Push to Exit New Sign Under Development
I20-1 Acknowledgment Redesignated Under Development
I20-2 Acknowledgment Redesignated Under Development
I20-3 Acknowledgment Redesignated Under Development
I20-4 Acknowledgment - Rest Area New Sign Under Development
I20-4a Acknowledgment - Welcome Center New Sign Under Development
I20-5P Acknowledgment (plaque) New Sign Under Development
E1-1 Advance Guide (1 destination) New Sign Under Development
E1-2 Advance Guide (2 destinations) New Sign Under Development
E1-3 Advance Guide (3 destinations) New Sign Under Development
E1-5P Exit Number (1, 2 digits) (plaque) Under Development
E1-5aP Exit Number (3 digits) (plaque) Redesignated Under Development
E1-5bP Exit Number (1, 2 digits with single-letter suffix) (plaque) Redesignated Under Development
E1-5cP Exit Number (3 digits with single-letter suffix) (plaque) Redesignated Under Development
E1-5dP Exit Number (1, 2 digits with dual-letter suffix) (plaque) Redesignated Under Development
E1-5eP Exit Number (3 digits with dual-letter suffix) (plaque) Redesignated Under Development
E1-5fP Left Exit Number (1, 2 digits) (plaque) Redesignated Under Development
E1-5gP Left Exit Number (3 digits) (plaque) Redesignated Under Development
E1-5hP Left Exit Number (1, 2 digits with single-letter suffix) (plaque) Redesignated Under Development
E1-5iP Left Exit Number (3 digits with single-letter suffix) (plaque) Redesignated Under Development
E1-5jP Left Exit Number (1, 2 digits with dual-letter suffix) (plaque) Redesignated Under Development
E1-5kP Left Exit Number (3 digits with dual-letter suffix) (plaque) Redesignated Under Development
E1-5mP Left (plaque) Redesignated Under Development
E2-1aP Next Exit (2 lines) (plaque) Redesignated Under Development
E2-1P Next Exit (1 line) (plaque) Redesignated Under Development
E3-1 Supplemental (1 destination) New Sign Under Development
E3-2 Supplemental (2 destinations) New Sign Under Development
E4-1 Exit Direction (1 destination) New Sign Under Development
E4-2 Exit Direction (2 destinations) New Sign Under Development
E4-3 Exit Direction (3 destinations) New Sign Under Development
E5-1 Exit Gore (no exit number) Under Development
E5-1a Exit Gore (1, 2 digits) Under Development
E5-1bP Exit Number (plaque) (1, 2 digits) Under Development
E5-1c Narrow Exit Gore Under Development
E6-1 Pull-Through Redesignated Under Development
E6-1a Pull-Through (Destination) Redesignated Under Development
E6-2 Pull-Through (Down Arrows) New Sign Under Development
E6-2a Pull-Through (Destination, Down Arrows) New Sign Under Development
E7-1 Post-Interchange Distance New Sign Under Development
E7-2 Post-Interchange Distance New Sign Under Development
E7-3 Post-Interchange Distance New Sign Under Development
E7-4 Post-Interchange Travel Time New Sign Under Development
E7-5 Distance and Travel Time New Sign Under Development
E7-6 Comparative Travel Time New Sign Under Development
E8-1 Preferential Lane Entrance Gore Under Development
E8-1a Preferential Lane Intermediate Entrance Gore Under Development
E8-2 Preferential Lane Entrance Direction (overhead) Revised Size Under Development
E8-2a Preferential Lane Entrance Direction (post-mounted) Under Development
E8-3 Preferential Lane Entrance Advance Under Development
E8-4 Preferential Lane Direct Exit Gore Under Development
E8-5 Preferential Lane Intermediate Egress Direction Under Development
E8-6 Preferential Lane Intermediate Egress Advance Under Development
E9-1 Interchange Sequence (2 interchanges) New Sign Under Development
E9-2 Interchange Sequence (3 interchanges) New Sign Under Development
E9-3 Next Exits (1 destination) New Sign Under Development
E9-3a Next Exits (2 destinations) New Sign Under Development
E9-4 Community Interchanges (2 interchanges) New Sign Under Development
E9-5 Community Interchanges (3 interchanges) New Sign Under Development
E11-1 Exit Only (with Down arrow) Under Development
E11-1a Exit Under Development
E11-1b Only Under Development
E11-1c Exit Only Under Development
E11-1d Exit Only (with Directional arrow) Under Development
E11-1e Exit Only (with two Directional arrows) Under Development
E11-1f Exit Only (with two Down arrows) Under Development
E11-2 Left (panel) Under Development
E13-2 Exit Direction Advisory Speed - Ramp (panel) Under Development
EM1-1 Evacuation Route Redesignated Under Development
EM1-1a Evacuation Route - Hurricane New Sign Under Development
EM1-2 Evacuation Route - Tsunami Redesignated Under Development
EM2-1 Area Closed Redesignated Under Development
EM2-2 Traffic Control Point Redesignated Under Development
EM2-3 Maintain Top Safe Speed Redesignated Under Development
EM2-4 Permit Required Redesignated Under Development
EM3-1 Emergency Aid Center - Medical Redesignated Under Development
EM3-1a Emergency Aid Center - Welfare Redesignated Under Development
EM3-1b Emergency Aid Center - Registration Redesignated Under Development
EM3-1c Emergency Aid Center - Decontamination Redesignated Under Development
EM4-1 Shelter Directional - Emergency Redesignated Under Development
EM4-1a Shelter Directional - Hurricane Redesignated Under Development
EM4-1b Shelter Directional - Fallout Redesignated Under Development
EM4-1c Shelter Directional - Chemical Redesignated Under Development

Temporary Traffic Control Signs

Sign Designation
Sign
Notes
Date Posted
R1-7 Wait on Stop Under Development
R1-7a Wait on Stop - Go on Slow New Sign 9/27/24
R1-8 Go on Slow Under Development
R2-12 End Work Zone Speed Limit Under Development
R4-9a Stay in Lane to Merge Point New Sign 9/27/24
R9-8 Pedestrian Crosswalk Under Development
R9-9 Sidewalk Closed Under Development
R9-10 Sidewalk Closed, Use Other Side Under Development
R9-11 Sidewalk Closed Ahead, Cross Here Under Development
R9-11a Sidewalk Closed, Cross Here Under Development
R9-12 Bike Lane Closed New Sign 9/27/24
R22-2 Turn Off 2-Way Radio and Cell Phone Redesignated Under Development
W1-4b Reverse Curve (2 lanes) Under Development
W1-4c Reverse Curve (3 lanes) Under Development
W6-4 Narrow Two-Way Traffic Under Development
W8-24 Steel Plate Ahead Under Development
W9-2a Merge Here Take Turns New Sign 9/27/24
W9-3 Interior Lane Shift Ahead Under Development
W13-4P On Ramp (plaque) Under Development
W20-1 Road Work (with distance) Under Development
W20-1b Path Work (with distance) New Sign 9/27/24
W20-2 Detour (with distance) Under Development
W20-2a Bike Detour (with distance) New Sign 9/27/24
W20-3 Road Closed (with distance) Under Development
W20-3a Path Closed (with distance) New Sign 9/27/24
W20-4 One Lane Road (with distance) Under Development
W20-5 Lane Closed (with distance) Under Development
W20-5a 2 Lanes Closed (with distance) Under Development
W20-5b Bike Lane Closed (with distance) New Sign 9/27/24
W20-7 Flagger Under Development
W20-7a Flagger Under Development
W20-8 Slow (on Stop/Slow Paddle) Under Development
W21-1 Workers Under Development
W21-1a Workers Under Development
W21-2 Fresh Oil Under Development
W21-3 Road Machinery Ahead Under Development
W21-4 Slow Moving Vehicle Under Development
W21-5 Shoulder Work Under Development
W21-5a Shoulder Closed Under Development
W21-5b Shoulder Closed (with distance) Under Development
W21-6 Survey Crew Under Development
W21-7 Utility Work (with distance) Under Development
W21-8 Mowing Ahead Under Development
W22-1 Blasting Zone Ahead Under Development
W22-3 End Blasting Zone Under Development
W23-1 Slow Traffic Ahead Under Development
W24-1 Double Reverse Curve (1 lane) Revised Under Development
W24-1a Double Reverse Curve (2 lanes) Revised Under Development
W24-1b Double Reverse Curve (3 lanes) Revised Under Development
W24-1cP All Lanes (plaque) Under Development
E5-2 Exit Open Under Development
E5-2a Exit Closed Under Development
E5-3 Exit Only Under Development
G20-1 Road Work Next XX Miles Under Development
G20-2 End Road Work Under Development
G20-4 Pilot Car Follow Me Under Development
G20-5aP Work Zone (plaque) Under Development
M4-8P Detour Under Development
M4-8a End Detour Under Development
M4-8bP End (plaque) Redesignated Under Development
M4-9 Detour Under Development
M4-9a Bike/Pedestrian Detour Under Development
M4-9b Pedestrian Detour Under Development
M4-9c Bike Detour (with arrow) Under Development
M4-10 Detour Under Development

School Signs

Sign Designation
Sign
Notes
Date Posted
S1-1 School Under Development
S3-1 School Bus Stop Ahead Under Development
S3-2 School Bus Turn Ahead Under Development
S4-1P Time of Day (plaque) X:XX to X:XX AM X:XX to X:XX PM Revised Size Under Development
S4-2P When Children Are Present (plaque) Revised Size Under Development
S4-3P School (plaque) Revised Size Under Development
S4-4P When Flashing (plaque) Revised Size Under Development
S4-5 Reduced School Speed Limit Ahead Under Development
S4-5a Reduced School Speed Limit Ahead Under Development
S4-6P Days of Week (plaque) Mon-Fri Revised Size Under Development
S4-7P All Year (plaque) Under Development
S5-1 School Speed Limit XX When Flashing Under Development
S5-2 End School Zone Under Development
S5-3 End School Speed Limit Under Development
R1-5a Yield Here to School Crossing New Sign 9/27/24
R1-5c Stop Here for School Crossing New Sign 9/27/24
R1-6b In-Street School Crossing - Yield Under Development
R1-6c In-Street School Crossing - Stop Under Development
R1-9b Overhead School Crossing - Yield New Sign 9/27/24
R1-9c Overhead School Crossing - Stop New Sign 9/27/24

Miscellaneous Sign Details

Detail
Date Issued
Overhead Arrow-per-Lane Arrows 9/27/2024